Visual example

OFFICE

Unique cultural landmark offers modern offices in the heart of Frankfurt’s city center

Behind the impressive, listed façade of the refurbished Bonwit & Bär, approx. 4,493 sqm of new, exclusive office spaces are being created. Located just a few minutes off the famous Frankfurt Zeil, the striking building is ideally situated for office and retail in an urban city. The imposing Art Nouveau façade from 1903 ensures an inviting and stylish ambience from the outside, and within. Bonwit & Bär offers an optimal, modern working environment with its spacious balconies and terraces, as well as through its loft and office areas which are equipped to a high standard. A new workspace with history – this is what a building entwined in the past and present will provide.

Office Features

The highlights

Historic Art Nouveau façade from the early 20th century
High-quality revitalisation with partial extension to new-build standard
Very prestigious entrance situation, in each case from Stiftstrasse and Brönnerstrasse with the possibility of an exclusive manned reception
Inviting terraces on various floors and a large courtyard terrace on the 1st floor
Barista (public) planned on the ground floor
Stepless and barrier-free access to the building
Modern and contemporary building and office equipment
WiredScore certification for digital connectivity and infrastructure in a cultural monument in the Gold category provided, including fibre optic redundancy by three providers (Telekom, Vodafon, Colt)
Wheelchair-accessible WC on the ground floor; showers or wheelchair-accessible WC on the office floors can be provided if required
Secure bicycle storage for 40 bicycles in the basement, accessible via a lift

Advantages at a glance

BONWIT & BÄR: a class of its own

New construction / revitalisation, therefore comprehensive warranties (5 years with exceptions) and minimal maintenance and repair costs for the tenant
One of three listed revitalisations in Germany with DGNB Gold certification (pre-certificate already issued)
KFW efficiency building listed building
Minimised operating costs and high resilience to changes in energy prices thanks to the use of state-of-the-art building technology (ventilation, cooling & heating, etc.)
CO2-reduced refurbishment with minimal consumption of grey energy through building in existing structures
Integrative control and monitoring systems ensure transparent operation.
In addition, a transparent meter concept allows user-related energy consumption recording and optimisation
Interior fit-out in accordance with DGNB specifications: Use of environmentally friendly, recyclable and responsibly sourced materials and plasters.
Selection of sustainable materials is secured and documented during tendering and construction

Office
Stacking Plan

Office rental space ~ 4,493 sqm

(incl. balcony and terrace space,
rental square footage rounded)

FLOOR PLANS